|
|
FIELD PROVEN, AND IT REALLY WORKS! |
Now available in School Project Manual is for the Construction Administration, Quality Control and Structural Inspection of the "California Public School" Construction Project! |
45 years of
General Contracting, Construction Management, Inspection and
Construction Forensic Expert Litigation Support experience has gone into
the development of the "SCHOOL PROJECT
MANUAL" [122 pages]. |
Contains 122 Pages, in 12 Parts with:
28 EASY-TO-USE
TEMPLATE FORMS!
- CONTENTS -
| PART 1: | Introduction This part briefly introduces the purpose of the School Project Manual. |
| PART 2: |
Project Organization |
| PART 3: | Communication and
Meetings
This part contains procedures and protocol pertaining to correspondence, reports, job site visits, and meetings. Forms: Pre-Construction Meeting - In Attendance |
| PART 4: | Submittals and Shop Drawings This part contains procedures and protocol pertaining to the submittal of product data and shop drawings, by the Contractor, to the Architect for review. A comprehensive log is provided in the form, entitled "Submittal Log", which is divided into Construction Specifications Institute (CSI), Specification Section Divisions. Forms: Submittal Log ( CSI Divisions 2-16 ) |
| PART 5: | Scheduling This part contains procedures and protocol pertaining to a cost-loaded critical path method (CPM) progress schedule. |
| PART 6: | Testing and Inspection This part contains procedures and protocol pertaining to "Special Inspections" and Materials Testing (when they are required). |
| PART 7: | Special Inspection This part contains highly detailed (recommended) procedures and protocol for "Special Inspectors" to follow during their special inspections. This part is highly recommended reading for all participants, so they are aware of the procedures and requirements for the "Special Inspectors", and provide for adequate preparation and coordination. List and log forms are provided to maintain records for each "Special Inspector", their time on the job, and test specimens taken for Laboratory Testing. With Recommended Check Lists for: A. Duties & Responsibilities Form: Special Inspector's List - Division 2 - Site Work Form: Special Inspector's Log - Division 2 - Site Work B. Reinforced Concrete Inspections Form: Special Inspector's List - Division 3 - Concrete Form: Special Inspector's Log - Division 3 - Concrete Form: Concrete Placement Log C. Structural Masonry Inspections Form: Special Inspector's List - Division 4 - Masonry Form: Special Inspector's Log - Division 4 - Masonry Form: Masonry Prism Log Form: Masonry Mortar Log Form: Masonry Grout Placement Log D. Structural Steel & Welding Inspections Form: Special Inspector's List - Division 5 - Metals Form: Special Inspector's Log - Division 5 - Metals E. Sprayed-Applied Fireproofing Inspections Form: Special Inspector's List - Division 7 - Thermal and Moisture Protection Form: Special Inspector's Log - Division 7 - Thermal and Moisture Protection |
| PART 8: | Reports This part contains procedures and protocol for the reporting by the Architect, Engineers, Inspector of Record, and the Contractor to the Division of the State Architect, and for the "Special Inspector's" reporting to the School District, and the Contractor. Form: SSS 6A/E Architect and Engineer's Verified Report Form: SSS 6 Inspector of Record's Verified Report Form: Daily Report of Special Inspection Form: Field Data Sheet for Test Specimens Form: Structural Steel Fabrication Shipping Certificate |
| PART 9: | Requests for Information This part contains procedures and protocol pertaining to requests for information by the Contractor, Inspector of Record, and "Special Inspectors" (separate forms) directed to the Architect, with logs for tracking each R.F.I., the Architect's reply, and the time-line for responses. Form: R.F.I. Form: R.F.I. Log Form: Inspector's Inquiry Form: Inspector's Inquiry Log |
| PART 10: | Change Orders This part contains procedures and protocol pertaining to changes in the scope of work, which affects the Contract. Form: Proposal Request Log Form: Change Order Log |
| PART 11: | Safety This part addresses the establishment and protocol for an accident-prevention program, and the Contractors' injury and illness prevention program, as required by O.S.H.A. Copy: CAL-OSHA, Article 3, Section 1509 - ACCIDENT PREVENTION PROGRAM Copy: California, Title 8, Subchapter 7 - GENERAL SAFETY ORDERS, Section 3103 - INJURY AND ILLNESS PREVENTION PROGRAM |
| PART 12: | Project Close-Out This part contains procedures and protocol pertaining to completing the project, and administrative issues for close-out. |
|
||||||||||||||||||||||
Web Design and
Production by Michael S. Poles / MPGroup.
Copyright 1996-2008 - ALL RIGHTS RESERVED including
the right of reproduction in whole or in any part, in any form, without the
express permission of MPGroup.